MEP Design & Load Schedules

Define the demands that interior equipment and occupancy place on building services, using a coordinated record of assumptions, equipment requirements and proposed connections.

MEP Design & Load Schedule
From our project archive

What this service covers

A load schedule is useful only when its inputs are traceable. Equipment ratings, usage assumptions and room layouts need review before they inform distribution or capacity decisions. Changes to the furniture or equipment brief should trigger a check of the affected schedules.

Equipment demand register

Record the equipment inputs and identify missing or provisional information.

Design assumptions log

State the occupancy, operating and other assumptions used in the agreed calculations.

Coordination updates

Track changes between layouts, equipment selections and service schedules.

Delivery process

  1. Collect equipment and occupancy inputs
  2. Confirm assumptions and missing information
  3. Prepare the agreed service schedules
  4. Review changes with the responsible design team

Industries we serve

Office planning teams

Align workstation and meeting equipment requirements with the emerging layout.

Commercial kitchens and pantries

Identify appliance demands before service connection details are fixed.

Building owners

Review tenant demand information against available base-building data.

Frequently asked questions

What is an electrical load schedule?

It records connected equipment and the design assumptions used to assess demand and circuit or distribution requirements within the agreed design scope.

Can a schedule be prepared without equipment selections?

Preliminary allowances may be used if clearly identified, but final selections should be checked before relying on the schedule for installation.

Do layout changes affect MEP design?

They can alter connection locations, occupancy and equipment demand. Review the affected calculations and drawings whenever the brief changes materially.

Does a load schedule prove that existing services have spare capacity?

Not by itself. Existing-system information and an appropriate capacity assessment are also needed before new loads are accepted.