Installation, Testing & Commissioning

Check that installed work follows the approved scope and is ready for its intended use, with inspection points and test responsibilities planned before work is concealed or equipment is handed over.

Installation & Testing
From our project archive

What this service covers

Testing should relate to the systems actually installed. Inspection records, equipment checks and agreed functional demonstrations need clear acceptance criteria, with defects tracked through correction and rechecking rather than closed on visual appearance alone.

Inspection checkpoints

Identify stages that need review before services or fixings are concealed.

Test and demonstration records

Record the agreed checks, results and any limitations of the test conditions.

Defect closure log

Assign outstanding items and verify corrective work before sign-off.

Delivery process

  1. Agree inspection and test requirements
  2. Inspect installation at defined stages
  3. Perform applicable tests and demonstrations
  4. Correct defects and document rechecks

Industries we serve

Commercial fit-out projects

Coordinate inspections across furniture, finishes and building-service work packages.

Occupied premises

Plan test windows and isolations around users who depend on the existing systems.

Facilities handover teams

Receive accessible records of checks and any remaining operational limitations.

Frequently asked questions

Are all installations tested in the same way?

No. The test method and acceptance criteria depend on the system, equipment instructions and agreed project requirements.

When should installation inspections take place?

At relevant stages, including before concealment and before use, so issues can be corrected while the work remains accessible.

What happens if a test identifies a defect?

Record the issue, assign corrective work and repeat the relevant check before treating the item as complete.

Does a visual inspection replace functional testing?

No. Appearance checks and functional tests answer different questions; the applicable checks should be defined for each installation package.